ASHP Decarbonisation

As part of client decarbonisation scheme, a new warehouse/storage facility would be provided utilising electrically driven ASHP and internal heaters.
Client required set temperature in the space +16oC with ambient air on design at -5oC.

 

 

Specific attention was given to ………

  • COP, SCOP and project-specific efficiencies (rather than only the set SCOP parameters).
  • On board duty and standby inverter driven pumps.
  • Co-ordinated quantity and placement of heater blower units, avoiding shelving.
  • Destratification (ensuring heat got to the warehouse floor)
  • Defrost effect upon duty, guttering to cope with peak quantity (see photo) and defrost electric resistance heaters on frame.
  • Noise reduction utilising compressor housings and reduced fan speeds.
  • Due to location, coating of outdoor evaporator coil fins for coastal protection.
  • Buffer size (generous) giving system secondary-side stability.
  • Resilience in the event of one unit being serviced or developing a mechanical issue.